// Resources
Builder Resources
Everything you need to navigate BC Energy Step Code compliance. Guides, tools, rebate info, and municipality-specific resources.
Step Code Fundamentals
ACH50 Targets by BC Step Code Level
ACH50 targets by Step level, how blower door testing works, common failure points, and what it takes to hit 1.5 ACH50 for Step Code 4.
BC Step Code 4 Requirements: What Builders Need Before 2027
BC Step Code 4 requirements explained: 1.5 ACH50 airtightness, TEDI and MEUI targets by climate zone, what changes from Step 3, what it costs, and up to $15,000 in FortisBC rebates.
Step Code 4 Is Coming January 2027. Here's What Changes for Okanagan Builds.
Step Code 4 expected January 2027. ACH drops from 2.5 to 1.5, heat pumps required, FortisBC rebates up to $15K. What Okanagan builders need to do in the next 9 months.
Step Code 4 Builder Checklist
Phase-by-phase checklist for BC builders preparing for Step Code 4, from pre-construction planning through final testing, aimed at 1.5 ACH50.
What ACH50 Target Do You Need?
ACH50 targets for BC Step Code 3 (2.5), 4 (1.5) and 5 (1.0): what each number means, how it is tested, what it costs, and which your project needs.
BC Zero Carbon Step Code Explained
BC Zero Carbon Step Code explained: emission levels EL-1 through EL-4, the fossil fuel phase-out, and how it affects Part 9 residential builders.
Air Sealing & Compliance
AeroBarrier Case Studies: Okanagan ACH50
Airtightness data from 100+ AeroBarrier residential seals across BC's Interior. Best result 0.24 ACH50. Profiles from Kelowna, Vernon and more.
AeroBarrier Okanagan: Authorized Dealer
Okanagan's authorized AeroBarrier dealer serving Kelowna, West Kelowna, Vernon, Penticton and Lake Country. 100+ verified seals, 0.24 ACH50 best.
AeroBarrier vs Traditional Air Sealing
Compare AeroBarrier to caulking, tape and spray foam on cost, time, reliability and achievable ACH50, with Step Code 4 hit rates from 100+ Okanagan seals.
Air Sealing Checklist for Step Code
Phase-by-phase air sealing checklist for BC Step Code builds: foundation, framing, windows, penetrations, attic and the pre-drywall inspection.
Air Sealing Methods Compared
Compare caulking, tape, spray foam and aerosol sealing for BC Step Code compliance on cost, time, reliability and the ACH50 results each can reach.
10 Most Common Air Leaks in BC Homes
Where air leaks happen in new BC homes: rim joists, penetrations, rough openings and more, plus traditional and aerosol methods to seal each one.
How to Achieve 1.5 ACH50 in Wood Frame
Step-by-step guide to hitting 1.5 ACH50 on Okanagan wood-frame builds: air barrier strategy, sealing sequence and the pre-drywall test for Step Code 4.
One-Day AeroBarrier Seal Day Walkthrough
Hour-by-hour AeroBarrier seal day: setup, blower door pressurization, aerosol application, live ACH50 monitoring and verification. What builders expect.
Pre-Drywall Air Sealing and Testing
Why testing before drywall is the key step in your air sealing strategy: what to seal, when to test, common leak paths, and how it saves time and money.
Cost & Rebates
How Much Does AeroBarrier Cost in BC?
AeroBarrier pricing in BC explained: cost ranges by home size, what moves the price, ROI from rebates and energy savings, versus traditional sealing.
Real Cost of Step Code: Step 3 vs 4 vs 5
BC Energy Step Code cost breakdown for Part 9 builders: incremental cost per step level, what drives the premium, FortisBC rebates and ROI.
FortisBC New Home Rebates: Up to $20,000
FortisBC rebates for new BC homes: up to $15,000 per unit at Step 4 and $20,000 at Step 5, plus IDP and test rebates. Eligibility and how to apply.
Failed Blower Door Fix vs AeroBarrier
What a failed Step Code blower door test costs to fix versus sealing upfront with AeroBarrier. Decision math for Kelowna builders pricing Step 4 risk.
Complete Guide to BC Step Code Rebates (2026)
BC Step Code rebates explained: FortisBC, BC Hydro, CleanBC, municipal programs. How to stack rebates up to $20,000+ per home. Current for 2026.
Building Envelope
HVAC & Mechanical
Compliance & Process
Policy & Timeline
Testing & Compliance
Blower Door Test: How It Works, How to Pass
How a blower door test works for BC builders: ACH50 and CFM50 in plain terms, pre-drywall vs final test, how to prep, and what to do if you fail.
Mid-Construction Blower Door Testing
Mid-construction and final blower door testing for BC Step Code: how the test works, when to test, how to prepare, cost, and what to do if you fail.
Failed Your Blower Door Test? Next Steps
Failed a BC blower door test? Emergency air sealing, AeroBarrier rescue, and how to get your occupancy permit without opening finished drywall.
Technical
Step Code Levels
BC Step Code 3: Requirements and Cost
Guide to BC Energy Step Code 3 for Part 9 builders: 2.5 ACH50 target, wall and window specs, common failure modes, cost premium and FortisBC rebates.
BC Step Code 5: Net-Zero Ready, Walls, Mechanicals & $20K Rebate
Step Code 5 is BC's near-Passive-House tier. 1.0 ACH50 airtightness, R-30+ walls, triple-pane U-0.8 windows, 80%+ HRV, $20K FortisBC rebate, and 8-15% cost premium.
Municipality Guides
Armstrong Step Code
Step Code 3 in City of Armstrong. CZ5 North Okanagan climate, Spallumcheen Township boundary, agricultural and rancher build patterns, and FortisBC rebate stack up to $20,000.
Big White Step Code and Air Sealing
Big White BC Step Code requirements and air sealing: ACH50 targets, blower door testing, FortisBC rebates and compliance guidance for builders.
Coldstream Step Code
Step Code 3 in District of Coldstream. CZ5 climate, Kalamalka Lake context, large-lot rural-residential builds, RDNO coordination, and FortisBC rebate stack up to $20,000.
Enderby Step Code and Air Sealing
Enderby BC Step Code requirements and air sealing: ACH50 targets, blower door testing, FortisBC rebates and compliance guidance for builders.
Kamloops Step Code
Step Code 3 in Kamloops since 2022. CZ5 with semi-arid climate, hot summers driving cooling load, Sun Peaks elevation, vapor strategy considerations, and rebate stack up to $20,000.
Kelowna BC Energy Step Code Requirements
BC Energy Step Code in Kelowna: Step 3 and 2.5 ACH50 today, the City permit process, local energy advisors, CSA F280 heat loss and the rebates to stack.
Lake Country Step Code
Step Code 3 in District of Lake Country. Bylaw 1070 permit fee rebates for Step 3/4/5, four distinct wards, hillside walkout considerations, and rebate stack up to $20,000.
Lumby Step Code
Step Code 3 in Village of Lumby. Monashee corridor cold-air drainage, custom rural homes with wood stoves, RDNO boundary considerations, and FortisBC rebate stack up to $20,000.
Merritt Step Code and Air Sealing
Merritt BC Step Code requirements and air sealing: ACH50 targets, blower door testing, Nicola Valley climate context and FortisBC rebate information.
Oliver Step Code and Air Sealing
Oliver BC Step Code requirements and air sealing: ACH50 targets, blower door testing, FortisBC rebates and compliance guidance for builders.
Osoyoos Step Code and Air Sealing
Osoyoos BC Step Code requirements and air sealing: ACH50 targets, blower door testing, FortisBC rebates and compliance guidance for builders.
Peachland Step Code and Air Sealing
Peachland BC Step Code requirements and air sealing: ACH50 targets, blower door testing, FortisBC rebates and compliance guidance for builders.
Penticton Step Code
Step Code 3 in Penticton. CZ5 climate, Skaha vs Okanagan Lake micro-climates, City Yards permit process, and FortisBC rebate stack up to $20,000 for Step 4 and 5 projects.
Revelstoke Step Code
Step Code 3 in Revelstoke. Climate Zone 6 with ~4,500 HDD, snow loads, ski-chalet construction patterns, City building permit process, and rebate stack up to $20,000.
Salmon Arm Step Code and Air Sealing
Salmon Arm BC Step Code requirements and air sealing: ACH50 targets, blower door testing, Shuswap climate context and FortisBC rebate guidance.
Squamish BC Step Code Requirements
Step Code 3 for Squamish builders: climate zones from coastal CZ4 to CZ6 with elevation, why a Vancouver spec may not transfer, and the permit sequence.
BC Step Code by Municipality Table
Compare BC Energy Step Code requirements across 25+ municipalities: step level, Zero Carbon tier, climate zone, HDD and notable local rules.
Summerland Step Code and Air Sealing
Summerland BC Step Code requirements and air sealing: ACH50 targets, blower door testing, FortisBC rebates and compliance guidance for builders.
Surrey BC Step Code
Step Code 3 and Zero Carbon EL-1 in Surrey: the mandatory mid-construction blower door test, Climate Zone 4, the City permit sequence and common gaps.
Vancouver Step Code and VBBL Requirements
Vancouver uses its own Building By-law, not the BC Building Code. Energy, carbon and airtightness rules for new homes, permits, and how it differs from BC.
Vernon BC Step Code Requirements
Step Code in Vernon BC: Step 3 and 2.5 ACH50, about 3,900 HDD, Silver Star and Predator Ridge elevation notes, the permit process, and rebates to stack.
West Kelowna Step Code
Step Code 3 requirements for West Kelowna. Glenrosa elevation, wildland-urban interface considerations, McDougall Creek rebuild context, and rebate stack up to $20,000.
Services
AeroBarrier Air Sealing
Aerosol air sealing that reliably hits your ACH50 target. 100+ verified seals.
Blower Door Testing
Pre-drywall and final blower door testing for BC residential projects.
Step Code Compliance Support
Planning, strategy, and field support for Step Code compliance.
Commercial Air Sealing
Part 3 building envelope sealing for multi-unit, office, and institutional buildings.
Retrofit Air Sealing
AeroBarrier air sealing for existing homes. Lower bills and better comfort.
Tools
// Air sealing for Step Code
Get a Step Code air-sealing quote
Targeting Step 3–5 airtightness? Tell us about the build and Okanagan AeroBarrier will get back to you with options and pricing. No obligation.